VAALCO on track with Gabon development programme

VAALCO HAS SUCCESSFULLY drilled and completed the Etame 7H development well and has moved the contracted rig, the Sapphire Driller, onto location to drill the South Tchibala development well (ETBSM-2H) from the existing Avouma / South Tchibala platform. The ETBSM-2H well was spudded on October 4, 2010.

VAALCO is currently mobilizing the installation vessel from Houston, Texas to the ET-7H well location to begin the work to lay and connect the production, service and gas lift lines between the sub-sea tree and the company's FPSO facilities. As previously announced, initial production from this well is expected in the fourth quarter of 2010.

Following the drilling of the ETBSM-2H development well in the South Tchibala field, VAALCO will drill a new exploration well, ETOMG-1 in the Omangou prospect. The prospect is located approximately two miles southeast of the Ebouri platform and approximately four miles to the northwest of the center of the Etame field.

The Company's subsidiary VAALCO Gabon Etame, Inc. operates the Etame Marin Permit in which it holds a 28.07 per cent net interest in the Etame Field. Other participants in the permit are Addax Petroleum Etame Inc. (31.36 per cent), Sasol Petroleum Etame Limited (27.75 per cent), Sojitz Etame Limited (2.98 per cent), PetroEnergy Resources Corp. (2.34 per cent) and Tullow Oil Gabon SA (7.5 per cent).

 

Alain Charles Publishing, University House, 11-13 Lower Grosvenor Place, London, SW1W 0EX, UK
T: +44 20 7834 7676, F: +44 20 7973 0076, W: www.alaincharles.com

twn Are you sure that you want to switch to desktop version?