Sidebar

webvic-b

twitter Facebook linkedin acp

Top Stories

Grid List

bp and Shell signed agreement with NOC Libya on separate instances. (image source: NOC Libya)

Exploration

bp has announced the reopening of its office in Tripoli by the year-end as it plans to resume operations in Libya, and manage projects from the ground 

This development was made official by a memorandum of understanding established at a signing ceremony in London, where the chairman of the National Oil Corporation of Libya, Masoud Suleman acknowleged the renewed partnership with the British oil major. 

The MoU will enable bp to study hydrocarbons potential in not only the Messla and Sarir fields but also in the adjacent areas. 

Suleman assured consistent support and assistance for bp's reestablishment in the region, while calling for cooperation and training technical and leadership staff in Libya’s oil sector

Meanwhile, another oil major, Shell, will be doing a comprehensive technical and economic feasibility study to develop the al-Atshan field, and check its hydrocarbons prospects. The agreement with NOC Libya also gives Shell rights to explore other NOC-owned fields that do not involve any third parties. 

Also read: 

Libya eyes production boost 

The partners will conduct a high-resolution gravity survey. (Image source: 88 Energy)

Geology & Geophysics

88 Energy Limited has secured license extension for 12 months from the Namibian Government, extending the PEL 93 First Renewal Exploration Period to 2 October 2026

During the extended period the company will aim datasets Integration to select drilling location, and complete an Environmental Impact Assessment (EIA) for drilling

The PEL 93 is located in the Owambo Basin, onshore Namibia.

A farmout agreement with Monitor Exploration Limited for a joint venture gives 88 Energy Limited a 20% working interest in PEL 93. By way of an amendment on the agreement, the partners have introduced a new stage 1A work programme to target pre-drill de-risking.

The 2024 2D seismic data collected from an anticlinal structure -- Lead 9 -- spreading across 100 sq km has led to new insights to be unlocked from a gravity survey area. The partners have hence included on the programme a high-resolution gravity survey to focus on the southern area of PEL 93. The survey will be supplemented by radiometric data. 

This anticipation has been strengthened by similar findings from the Kavango West 1X exploration well where ReconAfrica is now all set to start drilling this month. 

Lead 9 is similar to Recon’s imminent Kavango West 1X well in that both show a very large and robust structural closure including the shallow clastic reservoirs, the deeper Otavi carbonate reservoir seen in Naingopo-1 and the deeper source rocks.

Monitor's statement read, “Our early results are pointing to something potentially significant in the southern area of PEL 93 in the Owambo Basin. With multiple datasets aligning and the prospect of even larger structures emerging, the Joint Venture is building momentum towards a drilling event and what could be a basin opening discovery with broad implications for all of Namibia given the significance in unlocking a major new hydrocarbon play.” 

The project will involve the installation of compact twin-well configurations. (Image source: Adobe Stock)

Technology

The engineering, procurement, installation and commissioning work for Phase XI Deepwater Project of the West Delta Deep Marine (WDDM) concession has been vested on Petroleum Marine Services (PMS) by independent engineering consultancy Longitude Engineering

Longitude’s engineering scope comprises the detailed design of deep-water rigid jumpers, development of fabrication drawings, onshore and offshore handling procedures, offshore installation engineering, process and stress modelling, and key HSE studies and engineering workshops.

The Phase XI development of the Burullus gas field involves the tie-in of three subsea twin deep-water natural gas wells. The scope of work includes engineering, procurement, fabrication, installation, and commissioning support five subsea M-shape rigid jumpers, equipped with deep-water specialised connectors, multiphase gas meters, and sand detection systems.

Compact twin-well configurations will be installed, each with a subsea jumper span limited to approximately 25 meters in length. This will be placed in a brownfield environment adjacent to an existing live natural gas deep-water system, part of one of the largest deep-water natural gas networks globally.

A tie-in structure, namely “Tie-In Spool Base, TSB” designed to accommodate multiple jumpers within a single subsea module will offer enhanced production flexibility and enabling well allocation interchangeability.

Subsea control system components to support well operation and chemical injection. 

Located approximately 90 kilometres offshore Egypt, in the north-western Nile Delta region of the Mediterranean Sea, the WDDM concession is operated by Shell through its joint venture, Burullus Gas Company. The area includes 17 gas fields at water depths ranging from 300 to 1,200 meters.

“We are delighted to secure this contract following the success of our previous work on Phase X. The West Delta Deep Marine development is of major significance to Egypt’s oil and gas sector, and we remain committed to delivering the highest quality of service to PMS and, ultimately, to the operator,” said Daniel McGowan, Offshore Project Director at Longitude Engineering.

Longitude Engineering provides specialised engineering, design, and analysis consultancy services across various markets, including renewables, maritime, oil and gas, and infrastructure. The company’s expertise spans concept selection, Pre-FEED and FEED studies, marine operations engineering, and vessel design.

 

Eni has signed a production sharing contract with SONATRACH for development and exploration opportunities in the Zemoul El Kbar area, which is located in the Berkine Basin near the East of Hassi Messaoud 

This comes following Eni's win of the Reggane II block in partnership with PTTEP at the 2024 Algeria Bid Round.

Drawn in line with Algeria's hydrocarbon law n°19-13, the contract is valid up to 30 years, with an expansion scope for an additional 10 years. Backed by a seven-year window for research, the budget set for exploration and development activities amount to US$1.35bn, with US$110mn allocated to research investments. 

With the Zemoul El Kbar development, Algeria will see the integration of the latest digital solutions in operating, production optimisation practices, and reserves recovery. These advanced technologies will maximise asset valuations for the partners and equip Zemoul El Kbar to produce approximately 415 mn boe of which 9.3 bn cu/m will be at the end of the contractual period.

In addition, recourse to local content and subcontracting of national suppliers is privileged, within the frame of this contract. A three-year framework agreement between SONATRACH, Eni and ECU will advance skills and knowledge transfer to support SONATRACH employees. 

The partners also signed a gas agreement to support the hydrocarbons contract to enable the export of dry gas from the Zemoul El Kbar Exploitation Perimeter.

 

 

 

 

 

 

The new 750-meter quay will double the terminal’s capacity. (Image source: Adobe Stock)

Downstream

As part of production optimisation strategy, the Republic of Congo is advancing investments on infrastructure development

With aims to expand the container terminal at the Port of Pointe Noire, a €230mn in financing has been generated to onboard freight forwarding service Africa Global Logistics (AGL) for the project.

The new 750-meter quay – scheduled for completion by 2027 – will double the terminal’s capacity to 2.3 million containers annually and support the country’s growing oil and LNG exports.
The Pointe Noire project is being executed by AGL’s subsidiary Congo Terminal in collaboration with engineering firm China Road and Bridge Corporation. Backed by both international and Congolese banks, the €400mn platform will include 26 hectares of quayside, a dredged 17-meter-deep basin, and the installation of 16 gantries. It forms a key part of Congo’s strategy to boost hydrocarbon production to 500,000 barrels of oil per day and LNG output to 3 million tons per annum within five years.

In Angola, AGL also launched operations at its Lobito Terminal in March last year. The terminal – Angola’s second-largest port hub – handles over one million tons of bulk cargo and more than 100,000 20-ft equivalent unit containers annually, with 730 employees operating deepwater berths and modern equipment. The project comes at a pivotal time for Angola, which is preparing to bring several major energy developments online between 2025 and 2028. These include the Cabinda Oil Refinery in 2025, the Agogo Integrated West Hub development in late-2025, the Quiluma and Maboqueiro gas fields in 2026 and the Kaminho Deepwater Development in 2028.

Meanwhile, in Ivory Coast, AGL is playing a vital role in Phase 2 of the Baleine offshore development - West Africa’s first net-zero emissions project. In partnership with engineering firm Saipem, AGL began manufacturing critical subsea structures for the Baleine field in April 2024 at its Carena shipyard in Abidjan. The works include anchoring systems and underwater fixtures totaling over 200 tons, to be deployed in ultra-deep waters. AGL has mobilized 100 skilled local workers – including certified welders, painters and crane operators – reinforcing its commitment to local content, capacity building and sustainable energy infrastructure in Ivory Coast’s rapidly growing oil and gas sector.

AGL’s recent activities in Africa align with its broader vision to support the continent’s energy infrastructure. In addition to the Republic of Congo, Angola and Ivory Coast, the company is currently modernising the Walvis Bay terminal in Namibia while playing a key role in major energy logistics across Mauritania, Senegal and Mozambique. 

 

Major operators are increasingly adopt AI. (Image source: African Energy Chamber)

Event News

As Africa is zooming in on brownfield sites for maximum oil recovery, artificial intelligence and machine learning technologies are fuelling the industry's optimisation goals

Redifining operational efficiency by extending field life and maximising output, AI is set to move the oil and gas industry at a US$6.4bn market value by 2030.

As major operators increasingly adopt AI, global oilfield technology companies like Baker Hughes, Halliburton or SLB have opened bases in Africa. SLB's technology is backing several billion-dollar oil projects in Angola, and has introduced the Africa Performance Centre in Luanda this year. It has a strong presence in other regions of Africa as well.

Repsol has several developments underway in Libya, Algeria and Morocco and strives to bolster production across these markets. 

Enhanced oil recovery is currently witnessing a disruption as AI has unlocked access to large datasets which is unimaginable with traditional systems. This makes a huge difference for operators in taking the right decisions. With deep geological and production data in hand, reservoir management and pattern identification become much simpler. 

AI is now way past the experimental stage, and is being adopted on a policy level as well. Many African countries are streamlining policy to support EOR at legacy assets. Angola, for example, implemented its Incremental Production Initiative in 2024 which offers tax incentives to encourage reinvestments in mature oilfields. Energy major ExxonMobil made the first discovery – the Likembe-01 well - as part of the initiative in 2024, demonstrating the role policy plays in unlocking incremental resources. The African Union Commission also declared AI as a strategic priority for the continent in May 2025, citing the role machine-learning plays in transforming the continent’s development trajectory. 

These topics will drive conversations at the African Energy Week (AEW): Invest in African Energies 2025 that will be taking place from 29 September 29 to 3 October in Cape Town. 

Most Read

Latest news