twitter Facebook linkedin acp

AKER SOLUTIONS HAS signed a contract with Framo Engineering AS to supply a subsea umbilical and associated equipment for Totals CLOV development project located in the deepwater Block 17 offshore Angola. The contract value is approximately US$14mn.

p style="margin-bottom: 0cm;">AKER SOLUTIONS HAS signed a contract with Framo Engineering AS to supply a subsea umbilical and associated equipment for Totals CLOV development project located in the deepwater Block 17 offshore Angola. The contract value is approximately US$14mn.

 

Aker Solutions will supply a 10.6 km multiphase power and control umbilical (MPP umbilical) that will provide all system functions for the Framo Multiphase Pump Station.
The CLOV development comprises of the Cravo, Lirio, Orquidea and Violeta fields. A total of 34 subsea wells will be tied back to the CLOV FPSO unit, which has a processing capacity of 160,000 bpd and a storage capacity of 1.78mn barrels.

"We are very pleased to sign our first contract with Framo Engineering. This is a very important award for Aker Solutions and confirms our strong position of providing umbilicals to the most demanding subsea projects" says Tove Røskaft, senior vice president of Aker Solutions' umbilical business.
Engineering of the umbilical will be managed out of Aker Solutions' facility in Oslo, Norway and the MPP umbilical will be manufactured at Aker Solutions' facility in Moss, Norway. Final deliveries will be made in 2013.