THE TRANS SAHARAN Gas Pipeline (TSGP) may feed African gas into the East European (Nabucco) gas line after it has come on stream in 2015.
GHANA PLANS TO begin natural gas production from its offshore Jubilee field by the fourth quarter of this year for domestic consumption, according to Energy Minister Joe Oteng-Adjei.
PETROCELTIC, IN ASSOCIATION with its partner Sonatrach, announced that well testing of the Objective Devonian F2 formation at well INW-2 has been successful, with a gas well test rate of 16.7 million standard cubic feet per day ("mmscf/d") (19,740 cubic meters/hour) with a flowing wellhead pressure of 347.5 PSIG on a 96/64"' choke setting.
EGYPT HAS GIVEN preliminary approval to sending Jordan more gas through the Arab gas pipeline project, according to reports.
PETROCELTIC HAS ISSUED an operational update on its Isarene permit in the Illizi Basin in South Eastern Algeria. As previously announced, a gas column in excess of 80 meters
Alain Charles Publishing
University House,
11-13 Lower Grosvenor Place,
London, SW1W 0EX, UK
T: +44 20 7834 7676
F: +44 20 7973 0076
W: www.alaincharles.com